# | Document title | Authors | Year | Source | Cited by |
1 | Metaheuristics optimization approaches for two-stage reentrant flexible flow shop with blocking constraint | Sangsawang C., Sethanan K., Fujimoto T., Gen M. | 2015 | Expert Systems with Applications, 42(5), pp. 2395-2410 | 48 |
2 | Metaheuristics for scheduling unrelated parallel machines with sequence-dependent setup time and machine eligibility | Moonsri K., Sethanan K., Sangsawang C. | 2015 | Chiang Mai University Journal of Natural Sciences, 14(4), pp. 431-446 | 5 |
3 | GENETIC BASED ALGORITHMS TO SOLVING MULTI-QUAYS BERTH ALLOCATION PROBLEM WITH SETUP TIME CONSTRAINTS | Sangsawang C., Longploypad C. | 2022 | Logforum, 18(4), pp. 505-515 | 1 |
4 | Comparative analysis of berth allocation problem solving under different berth function assigning | Longploypad C., Sangsawang C. | 2024 | Journal of Maritime Research, 21(2), pp. 181-186 | 0 |