| # | Document title | Authors | Year | Source | Cited by |
| 1 | A Column Generation Approach for Personnel Sched uling with Discrete Uncertain Requirements | Pakpoom P., Charnsethikul P. | 2019 | 2018 2nd International Conference on Informatics and Computational Sciences, ICICoS 2018, pp. 185-190, 8621664 | 6 |
| 2 | A Stochastic Programming Approach for Cyclic Personnel Scheduling with Double Shift Requirement | Pakpoom P., Charnsethikul P. | 2018 | WSEAS Transactions on Systems and Control, 13(1), pp. 275-284 | 3 |
| 3 | Cyclic personnel scheduling with uncertain demand and double shift requirements | Pakpoom P., Charnsethikul P. | 2018 | AIP Conference Proceedings, 1982, 020035 | 1 |
| 4 | Production Improvement of Rail Joint by Industrial Engineering Techniques: Case Study of Rail Joint Production | Praisont C., Athikulrat K., Pakpoom P. | 2023 | Engineering and Technology Horizons, 40(4), 400402 | 0 |